RSJ installation labour costs: comparing two contractor quotes
Work through a day-rate and a fixed-price example. Separate labour, plant, unloading and reinstatement before adding installation to the steel budget.
Compare the same steel order across suppliers. Check cut lengths, fabrication, unloading and the tax basis before comparing two totals.
Copy a steel quotation enquiry
Work through a day-rate and a fixed-price example. Separate labour, plant, unloading and reinstatement before adding installation to the steel budget.
Convert a quoted steel rate to a common unit using the manufacturer mass. Check charged length, fabrication costs and delivery before comparing totals.
Build an RSJ project budget from defined quotation packages, compare net and gross prices and identify costs that are still unquoted.
Build a like-for-like record of GBP and PLN steel quotations. Work through a hypothetical exchange rate and identify charges still missing from the delivered price.
Work through a revised steel quote line by line. Separate a price change from added cutting, fabrication or delivery before adjusting the project budget.
Check a steel product declaration, its assessment boundary and project quantities before making environmental comparisons.
Compare two 4.3 m lengths of 203 × 133 × 25 UB delivered to Southend, including VAT and a basket discount. Download the sheet to check your own quotes.
Use a fee comparison sheet to separate the site visit, drawings, calculations and revision costs when appointing a structural engineer for an opening.