RSJ quote and project budget calculator

Total a supplier quote and entered project costs in UK pounds or Polish zloty, with an editable VAT rate.

How to use this tool

  1. Select the project country: UK (GBP) or Poland (PLN). Changing country clears monetary inputs.
  2. Select the quoted UB section for its weight, then enter ordered length, quantity and the quoted net price per metre.
  3. Enter net delivery for the entire order, confirm VAT, and add any other project costs as a gross total.

RSJ quote and project budget calculator

Enter your supplier's net price per metre. This tool totals your figures; it does not provide current market prices or cross-border import costs.

Changing country clears monetary inputs. No currency conversion is performed.

Include fabrication and finish in the quoted rate, or include their gross total in other costs. Other costs can include engineer, approvals, lifting, installation, bearings and fire protection. They receive no additional VAT here. Zero means no allowance entered, not that the service is free.

Standard VAT defaults: UK 20%; Poland 23%. These defaults do not determine the tax treatment of your particular transaction.

Budgeting only. Structural work requires a chartered structural engineer and the applicable Building Control approval. A cost estimate does not establish a suitable beam size.

Check a quote with delivery included

If two pieces cost £241 each including fabrication, the goods line is £482. A separate £75 delivery gives £557 before tax. Record whether unloading is included before comparing that total with another offer. These are invented prices for checking a quotation.

See the two complete quotations and copy the supplier enquiry

Questions and limitations

Does this tool contain current steel prices?

No. Enter a dated supplier quote. The calculator does not fetch market prices or assume installation, engineering or approval fees.

Can I choose express delivery or a finish?

There are no separate finish or express options. Include those charges in the quoted material rate or other gross costs, without counting them twice.

Does Poland mean importing steel into the UK?

No. Poland means a project budget in PLN, with a standard VAT default of 23%. UK budgets use GBP and a 20% default. Confirm the applicable rate. Currency conversion, customs and cross-border tax treatment are not calculated.

Data and editorial responsibility

Published by Krystian Welcel, a software developer. These tools have not received an independent structural engineering review. Read the data sources and calculation method.

Structural work must be designed by a chartered structural engineer and receive the applicable Building Control approval. These educational calculations are not construction specifications.