RSJ steel order | Quotation comparison RSJ.info | https://rsj.info/blog/where-to-buy-rsj-beams-online-2026/ Prepared by: ________________________ Date: _____________________ Project / delivery address: ______________________________________ Drawing number and revision: _____________________________________ ORDER TO PRICE Beam mark: __________ Full section and grade: ___________________ Quantity: ___________ Cut length per piece (mm): ________________ Use a separate line for each different mark, section or length. Fabrication detail and finish: ___________________________________ Required delivery point and access restrictions: __________________ SUPPLIER A B Name and quote reference ________________ ________________ Issue / expiry dates ________________ ________________ Drawing revision priced ________________ ________________ Currency and tax basis ________________ ________________ Original unit / rate ________________ ________________ Chargeable quantity or length ________________ ________________ Goods subtotal ________________ ________________ Cutting, plates and finish ________________ ________________ Delivery to agreed point ________________ ________________ Unloading ________________ ________________ Other charges ________________ ________________ Total before tax ________________ ________________ Tax amount on offer ________________ ________________ Total including tax ________________ ________________ Write "included" against work already in a piece price. Mark an unanswered item "unknown". Add it to the questions below before treating either figure as the total delivered cost. Differences in scope: _____________________________________________ Proposed substitutions for designer review: ________________________ Question / person responsible / reply date: ________________________ Drawing and quotation accepted: ___________________________________ Use the issued structural design for the order. This sheet records commercial scope and cannot select a beam or authorise fabrication.